I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (26 in total) :  <<   14   15   16   17   18  [ 19 ]  20   21   22   23   24   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 400 - BF 109Build07-Oct-07 15:32
Views : 1258
Fuselage per plan, wings have doubled 3/32" stringers.
moostang51Guillows Series 2000 - B-24 LiberatorBuild29-Sep-07 18:04
Views : 1319
Big bird has been dormant for a while but first coat of aluminum applied and most masked areas have been stripped. Wings and rudder not fixed yet as toooooo large to handle. Really enjoyed working on this today as all the photos provided by you nother m
moostang51Guillows Series 900 - TrojanBuild16-Sep-07 18:03
Views : 1818
Damn stickers weren't even dry yet. Oh...woe is me.
moostang51Guillows Series 900 - TrojanBuild16-Sep-07 18:02
Views : 1625
My son wanted the "stickers" on it. Geez, now I hope you all can appreciate what I deal with. Underside tomorrow...maybe.
moostang51Guillows Series 900 - TrojanBuild16-Sep-07 16:19
Views : 1459
Lines are for moveable surfaces only. Poppy, give you a lot of credit since you mark out all panel lines. Small spinner cut with a dremel from 1/2" square stock mounted on 3/32" wood dowel.
moostang51Guillows Series 900 - TrojanBuild16-Sep-07 16:15
Views : 1464
It was a good learning experience on trying the balsa sheeting in lieu of silkspan. Both have their advantages.
Hangar Aircraft Category Date Preview
moostang51Guillows Series 900 - TrojanBuild16-Sep-07 16:13
Views : 1658
Getting close to finishing. Will not install landing gear. Canopy still in limbo.
moostang51Guillows Series 900 - TrojanBuild02-Sep-07 16:15
Views : 1576
Two part canopy pressed correctly from Guillow's, so I thought and carve a mold to press into styrene. After four attempts, I may call Guillo'w for a replacement. NFG!!!
moostang51Guillows Series 900 - TrojanBuild02-Sep-07 16:12
Views : 1549
Poolside with temps in the 80's. Perfect temp for first coat of chrome paint. Tail surface wing walk, and side fuselage masked. Steel wool and 2nd coat tomorrow.
moostang51Guillows Series 900 - TrojanBuild31-Aug-07 17:05
Views : 1541
First prime and 400 grit rub. All imperfections revealed but plane is 90% glass finish. Rudder cracked so a little fixing is required.
moostang51Guillows Series 900 - TrojanBuild30-Aug-07 17:28
Views : 1421
Okay , I'm hooked. Micro-Fill is amazing. First application and sanding. Best part though, how easily it sands versus the Hobbico.
moostang51Guillows Series 900 - TrojanBuild30-Aug-07 09:02
Views : 1648
Covered and ready for Magic filler and sanding. Poppy, like silkspan, wings much less complicated than the fuselage. Single sheet for wings, 8 pieces for fuse.
Page (26 in total) :  <<   14   15   16   17   18  [ 19 ]  20   21   22   23   24   >>  [ < Prev ] [ Next > ]