I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:58
Views : 678
A big day in little Ogre’s life that being permanent wings.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:54
Views : 671
The epoxy molecules have once again worked their magic.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:53
Views : 717
Ogre’s 106.68 cm. upper wing span defines the limit to the shop work table.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:52
Views : 633
Now onward to the flight and bracing wires!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:02
Views : 618
Four areas remain inn Ogre’s compltetion: 1. Organize and tidy the shop. 2. Install the flight and rigging wires. 3. Connect the aileron linkages and cables. 4. Fabricate and install the airscrew.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:02
Views : 541
The little shop is vacuumed and organized a tad in preparation for the rigging wires.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:01
Views : 564
Organization finds lost treasures and tools.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:00
Views : 584
This cosmic occurrence usually twice per year.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 11:59
Views : 573
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 11:59
Views : 568
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 07:17
Views : 563
Ogre gets his wings this day. He sits and awaits polymerization and cross linking of epoxy molecules to work their magic. Again we were fortunate enough to hang the wings with only the aid of resilient aka elastic bands. A dab of the magic compound, places on each strut end should do the trick.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 07:17
Views : 525
Ogres rests, note the the lack of rubber bands required to hold the upper air foil in position on the cabane struts. Epoxy at work!
Page (32 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]