Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:54
Views : 827
The epoxy molecules have once again worked their magic.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:53
Views : 872
Ogre’s 106.68 cm. upper wing span defines the limit to the shop work table.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild18-Mar-15 06:52
Views : 796
Now onward to the flight and bracing wires!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:02
Views : 788
Four areas remain inn Ogre’s compltetion: 1. Organize and tidy the shop. 2. Install the flight and rigging wires. 3. Connect the aileron linkages and cables. 4. Fabricate and install the airscrew.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:02
Views : 700
The little shop is vacuumed and organized a tad in preparation for the rigging wires.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:01
Views : 716
Organization finds lost treasures and tools.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 12:00
Views : 732
This cosmic occurrence usually twice per year.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 11:59
Views : 733
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 11:59
Views : 734
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 07:17
Views : 713
Ogre gets his wings this day. He sits and awaits polymerization and cross linking of epoxy molecules to work their magic. Again we were fortunate enough to hang the wings with only the aid of resilient aka elastic bands. A dab of the magic compound, places on each strut end should do the trick.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 07:17
Views : 691
Ogres rests, note the the lack of rubber bands required to hold the upper air foil in position on the cabane struts. Epoxy at work!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild17-Mar-15 07:16
Views : 681
Gumby inspects the auxiliary petrol tank fuel line installation.
Page (32 in total) :  <<   3   4   5   6   7   8   9   10   11   12   13   >>  [ < Prev ] [ Next > ]