Hangar |
Aircraft |
Category |
Date |
Preview |
jernst | Dave Diels Engineering, Inc Kit #44, Curtiss SB2C-4 Helldiver | Build | 15-Jun-07 09:29 | | Views : 1726 | Tailfeather - mock up. I draw my markings by hand onto the tissue before covering. |
jernst | Dave Diels Engineering, Inc Kit #44, Curtiss SB2C-4 Helldiver | Build | 15-Jun-07 09:21 | | Views : 1754 | Similar to the wing, the Stab needs to be covered and in place before assembly of the rudder and fuse top deck in that area. |
jernst | Dave Diels Engineering, Inc Kit #44, Curtiss SB2C-4 Helldiver | Build | 15-Jun-07 09:20 | | Views : 1704 | |
jernst | Dave Diels Engineering, Inc Kit #44, Curtiss SB2C-4 Helldiver | Parked | 15-Jun-07 09:16 | | Views : 1561 | The covered wing is in place, and attached to the fuselage formers |
jernst | Dave Diels Engineering, Inc Kit #44, Curtiss SB2C-4 Helldiver | Parked | 15-Jun-07 09:15 | | Views : 1605 | Here are the major components. The tailfeathers have cap strips added to both upper and lower surfaces and have been sanded to an airfoil shape. |
jernst | Dave Diels Engineering, Inc Kit #44, Curtiss SB2C-4 Helldiver | Build | 15-Jun-07 09:12 | | Views : 1615 | Wing assembly in place. Once the wing is covered, the bottom longerons are inserted. |
|
|