Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3342 in total) :  <<   429   430   431   432   433  [ 434 ]  435   436   437   438   439   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
rgoodGWS Pico Tiger MothParked30-Oct-17 11:35
Views : 1000
"Dead Cow" field!
Don CScratch Built North American P-51Build29-Oct-17 20:58
Views : 804
Front cockpit frame (?) made from tongue depressor soaked and bent to shape now drying.
Don CScratch Built North American P-51Build29-Oct-17 20:55
Views : 755
Left side next.
Don CScratch Built North American P-51Build29-Oct-17 20:54
Views : 727
Been working on he cockpit.
David DuckettBerkeley North American T-28 TrojanBuild29-Oct-17 19:58
Views : 722
Shaped and notched leading and trailing edges and built off plan. It's a bit tricky but produces a very strong wing.
David DuckettBerkeley North American T-28 TrojanReference28-Oct-17 07:56
Views : 781
Southwest Airlines Boeing 737
Hangar Aircraft Category Date Preview
David DuckettBerkeley North American T-28 TrojanReference28-Oct-17 07:55
Views : 714
Arizona National Guard F-16
David DuckettBerkeley North American T-28 TrojanReference28-Oct-17 07:54
Views : 774
This EC-130 has major modifications to the fuselage which is all for Electronic Counter Measures.
David DuckettBerkeley North American T-28 TrojanReference28-Oct-17 07:52
Views : 732
At the other house, we were right in line with the approach to Tucson International for flights from Las Vegas and points west. Here we are under the approach from the east and the planes are lower. Here's a sample. American Airlines Boeing 737
David DuckettBerkeley North American T-28 TrojanReference28-Oct-17 07:45
Views : 758
David DuckettBerkeley North American T-28 TrojanBuild26-Oct-17 16:18
Views : 830
I'm waiting for CA accelerant before continuing with the fuselage. The wing is built next and attached to the fuselage.
David DuckettBerkeley North American T-28 TrojanBuild26-Oct-17 16:16
Views : 834
The formers are glued to a stiff paper jig, side rails are glued to the formers, and wood panels are then glued on. It is all 1/8" construction. The paper jig is supposed to be removed to allow control line installation.
Page (3342 in total) :  <<   429   430   431   432   433  [ 434 ]  435   436   437   438   439   >>  [ < Prev ] [ Next > ]