I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   18   19   20   21   22  [ 23 ]  24   25   26   27   28   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild22-Jan-15 15:59
Views : 336
This day Gumby fabricated a Ogre a set of “legs”.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild22-Jan-15 15:58
Views : 329
Though not fully completed the “legs” allow Ogre to stand on his own for the first time.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild22-Jan-15 15:56
Views : 318
Tomorrow he hopes to complete the install of the axle with its bungee chord suspension.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aFlying22-Jan-15 15:55
Views : 287
Ogre is beginning to look like an aeroplane.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild21-Jan-15 12:56
Views : 283
The Gumster had quite a physical day. First sawing the balsa block to obtain a roughed out nose block, then sanding the block to an acceptable shape.. He is whipped and will finish this task on the morrow!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild21-Jan-15 12:54
Views : 326
One, almost completed, nose block.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Jan-15 13:51
Views : 374
Goal accomplished....cockpit is revealed!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Jan-15 13:50
Views : 289
Gumby wants a fuel dragster!!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Jan-15 12:11
Views : 275
Gumby's goal of the day is to reveal the cockpit.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild20-Jan-15 12:00
Views : 312
Sanding and shaping. Every task needs a supervisor. Happily i get to watch Gumby toil!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild19-Jan-15 17:56
Views : 382
Gumby did some wood working this day. Tomorrow sand to shape and seal.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild19-Jan-15 17:55
Views : 340
Some sheeting and some planking.
Page (32 in total) :  <<   18   19   20   21   22  [ 23 ]  24   25   26   27   28   >>  [ < Prev ] [ Next > ]