I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   17   18   19   20   21  [ 22 ]  23   24   25   26   27   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 14:55
Views : 345
Well Gumby started the slow and tedious process of fuselage decorating. He wanted to accomplish more but I have him outside shoveling snow. With the amount of snow that is anticipated and the size of his snow shovel, he should be occupied for quite some time!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked26-Jan-15 14:54
Views : 315
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 14:53
Views : 284
Not completed but getting there!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 11:23
Views : 337
rayl...Maybe this will clarify the dashboard. A trip to a craft store for jewelry rings and rubber “O” rings for a bezel, instrument graphics, and nail polish to build up a lens.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Jan-15 14:56
Views : 319
Let the decorating commence!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Jan-15 16:00
Views : 497
The Gumster antiqued the cockpit interior a tad. He cannot wait to cover the wood and install the coaming.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Jan-15 15:58
Views : 317
The ventral surface of the fuse sheeting was completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Jan-15 15:57
Views : 322
Wood sealer was applied in preparation for covering.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked23-Jan-15 17:14
Views : 359
My little, “rubberized”, engineer has met the production goal.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Jan-15 17:13
Views : 302
None of the components in the landing gear are included in the short kit. The plan calls for a simple wire LG frame with some wood boards attached. The wheels are wooden disks with foam chord for tires.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Jan-15 17:11
Views : 276
It is my hope that the scratch built spoke wheels and bungee chord suspension give Ogre that “realistic” appearance.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild23-Jan-15 12:21
Views : 326
Gumby wheelie likes this work. On to the suspension next!
Page (32 in total) :  <<   17   18   19   20   21  [ 22 ]  23   24   25   26   27   >>  [ < Prev ] [ Next > ]