I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (29 in total) :  <<   23   24   25   26   27   28   29  [ < Prev ]
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild08-Jan-15 16:43
Views : 462
Longerons and formers mounted on the alignment jig. Got Clamps?
raylScratch Built Consolidated XF-92ABuild08-Jan-15 16:41
Views : 438
THis is the jig that I made to insure the alignment of the longerons. The longerons actually change elevation from the main spar back to the final former by about 7/16", thsu the jig.
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild08-Jan-15 16:38
Views : 448
It tool me a while to get the features on this site figured out and Jim had to change something for me to get in. That being said, I ve actually been working on this thing for about a month, so there will be lots of pictures intially. Here are all of the formers, of 1/8" ply except for the main wing spar which is 1/4' BAltic Birch ply. Cut them out on my bandsaw and sanded them round on my spindle sander.
raylScratch Built Consolidated XF-92ABuild08-Jan-15 16:33
Views : 551
Hi All. I'm going to try to build this thing. The plans were in the 1954 Air Trails Model Annual. I got them from the Outerzone site. It will be scaled at 3/4"-1ft. to match the Guillows kits.
Page (29 in total) :  <<   23   24   25   26   27   28   29  [ < Prev ]