I think all is working again now. Please leave a comment on a photo somewhere if something you need is not working still.

Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (29 in total) :  <<   20   21   22   23   24  [ 25 ]  26   27   28   29  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild12-Jan-15 14:54
Views : 434
A better shot of how the main L/G is mounted into the fuse. The L/G will be cross-pinned through the 1/4" ply bulkheads when I get that far. Once I test mounted the wings the actual size of this model suprissed me.
raylScratch Built Consolidated XF-92ABuild12-Jan-15 14:51
Views : 460
OK. The wings are started, they will be sheeted with 1/16" hard stock. The main gear wheels are starting to take shape. Again, there just are not many photos of this A/C to work from so any "rivet counters" ou there will have a hay-day with the wells.
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild10-Jan-15 10:08
Views : 425
After a cup of coffee and muttering a few choice phrases, I tried my luck on the lathe again: success! I had to laminate a poplar wood blank to make the Afterburner cone due to it's height. Turned out pretty good if I say so myself. THese will be attached later after all the planking is completed and the Exhaust duct/flame-holder has been fabricated and installed.
raylScratch Built Consolidated XF-92ABuild10-Jan-15 10:00
Views : 453
The finished master with my first attempt at forming the canopy. This is a totaaly new process to me: SLip the form into a soft-drink 2 liter bottle that has been cut off at both ends then apply heat from a heat gun and teh plastic magically shrinks the shape of the master. Cool!
Page (29 in total) :  <<   20   21   22   23   24  [ 25 ]  26   27   28   29  [ < Prev ] [ Next > ]