Hangar |
Aircraft |
Category |
Date |
Preview |
rayl | Scratch Built Consolidated XF-92A | Build | 18-Jan-15 10:12 | | Views : 469 | Finished all of the fuse planking. Installed 1/64" ply main L/G well inserts. I did this to simulate the thin edges of the wheel wells. I have three layers of sandinig sealer on the fuse now so the next step will be to lay on some automotive type high-fill primer. |
rayl | Scratch Built Consolidated XF-92A | Build | 18-Jan-15 10:04 | | Views : 479 | The main L/G firmly mounted into it's plywood bulkheads. I used a "Wixey" digital angle gauge to make sure the fuse was level (laterally) then set a bar across the L/G strutts to insure that they were level before supergluing them into place. I then drilled 3/32" cross pin holes through the main member and inserted music wire into those holes. The L/G shouldn't move at all. |
|
Hangar |
Aircraft |
Category |
Date |
Preview |
rayl | Scratch Built Consolidated XF-92A | Build | 17-Jan-15 09:49 | | Views : 473 | Bottom sheeting instaled on the wings and the elevons attached. Now I'm ready to finsih the fuse planking and move on to the sealer/primer stage. |
rayl | Scratch Built Consolidated XF-92A | Build | 17-Jan-15 09:44 | | Views : 512 | Main gear wells done. Ready to sheet the bottom of the wings. |
|